ITDP India conducted an analysis on how the Nigdi-Dapodi BRTS corridor and Pune Metro services, currently serve the city of Pune. Both these lines run parallel to each other and are complementing each other to ensure maximizing of the overall public transport usage. Key highlights of the study:
- The Nigdi-Dapodi BRTS corridor serves 1.5 lakh passengers daily, with 37 buses per hour during peak times,
- One bus every 1.6 minutes
- About 47% of users were students (18-25 years)
- Frequent users had a household income below ₹20,000/month
Download the full analysis here: BRT and Metro Integration for the Mumbai-Pune Highway
Leave a Reply